MRT Jakarta Future Network The rail-based Jakarta MRT is planned to stretch across ± 110.8 kilometres, which includes the 23.8 kilometres for the North-South Corridor (Lebak Bulus-Kampung Bandan) and 87 kilometres for East- West Corridor.

The North-South corridor will be built in two phases.
•Phase I, will be constructed in advance connects Lebak Bulus to Bundaran HI along 15.7 km including 13 stations (7 elevated stations and 6 underground stations), targeted to operate at the end of 2016.  
•Phase II, will extend the North-South line from Bundaran HI to Kampung Bandan along 8.1 Km (+8 underground stations), targeted to operate in 2018 (accelerated from 2020 as the original plan). Feasibility study already completed.

While the East-West corridor currently is in feasibility study phase. This line is targeted to operate in 2024.